Thursday, January 8, 2009

Construction Update Gaur Green Vista Indirapuram, Ghaziabad

This is my second post related to Gaur Green Vista, Indirapuram. The work is going pretty well and it seems the developers will give timely possession. The pictures and video below is about 2-3 months old and I hope the work is in full pace even till today. Major update is that the towers are almost complete and they have started plastering and wooden work in lower floors too. According to salesperson at site no flat of Gaur Green Vista is now available and the Project is completely sold out.

Now the bad news. V3S has started to construct their own flats in front of Gaur Green Vista towards the edge where Samrat floors ends. The edge is towards end of Samrat opposite to that of Maharaja Floors (GHAOI Buildwell). It seems developer did not told anyone that the front land towards the edge belongs to someone else. Also on right of this edge Gaur has launched a new project of 5 to 10 floors but they are trying to get approval of about 20+ floors. Below is pictures and video and hope you folks would enjoy the update.


                                                             

Related Posts by Categories



118 comments:

Anonymous said...

Yes, the construction is in full steaam and now all the floors are done, perhaps one more to go.
V3S is a real bad news - has taken the sex appeal of the building. i wish the developers had been more transparent. I am too a future resident and it will be good idea to keep this blog running.

SS

Anonymous said...

What more important for me is the possesion date. Next financial year we can take income tax exemption on home loan provided the possesion is on fixed date and same financial year. We can two two exemption 1) regular rebate on interest and principal 2) pre-emi interest of 1/5th the amount for next 5 years.

Anonymous said...

Hello,

I am also a future resident of Gaur Vista.

I visited the site in Nov 2008. At that time construction of the 10th floor was almost done. The sales person at the site also told us about the new flats that they are building.

The plan for the new flats is good but the cost is higher than the samrat model.

And Chiili Flakes...nice work ...all the very best.

Rajender Rawal said...

Thanks friend for this update.. I hope we get this possession on time which help us in saving tax for next financial year.. but I need to know what will be the cost of registry from Ghaziabad authority??

Please join below orkut community for more discussion and updated www.orkut.co.in/Main#Community.aspx?cmm=42613143

chilliflakes01 said...

The cost would be 5% for men and 4% for women of property value. In case ownership is joint than it would be 4.5% of porperty value. See this http://www.4jat.com/jat_community_article.asp?jat_community=568

Anonymous said...

I also visited the site. Construction is at full swing but surpised to see the Room Size. Rooms are really small. Don't you people feel about it

Anonymous said...

Yes, the room sizes are smaller but lot of balconies and open space. what didn't like was corridor - too narrow. it will not even accommodate two large sized persons! It will be dark too

SS

Anonymous said...

Hi,

I'm a NRI and currently live in Manchester. I have booked a flat in Gaur Greenvista.

Now I am planning to book my holidays and air tickets to come in India for the registry of my flat but I am not sure which week I can book now. Also how long it will take in Registry, I mean how many days I need to stay there for these paper works.

Also if anyone of you know that how we could rent our flat safely without having any risk..

any idea..please comment

Abhilash said...

Dear friends,

I am also a future resident of Green Gaur Vista.

I need to know what will be procedere for registry from Ghaziabad authority?? what will be the charges for the same, if I would supppose to take in my wife's name. How much benefit will I get from the same. As per the builder it is 7%. Is that true.
pls suggest

Anonymous said...

Hi,

I'm a future resident as well. I visited the site yesterday and looks like its pretty much in the same shape as the photo's posted earlier. They said there was a shortage of bricks but they're on track for posession in December. Have any of you tried to see if there's any premium on resale of these flats?

Anonymous said...

Hi ,I am also a member of gaur green vista (samrat-II). When I first saw the brocure , I saw 75 % open space , but now when I see new V3S buildings and some area been removed from it , it looks to me very congested .Look how much close Samarat -III and Maharaja buildings are. Also Room size are also very small , Overall , I am disappointed with the gaur green vista.

Anonymous said...

There seems to be one more minor problem regarding the parks . The parks would not be completed till Phase-2 gest completed , so that means phase-1 residents has to take the dust while phase-2 gets completed and they will not be able to avail the facility of the park. Also it looks unlikely to me possession in December , might be 2-3 months delay.

Anonymous said...

Spoken to a gaursons and they says that completion will be on time. Also if i could think right, there would be penalty on them if they can't give possession on time..
Vin

Anonymous said...

This project doesn't look worth spending money. They have made flats of very small size. 1250 sq. feet flat is constructed in 700 sq. ft only excluding balcony. Design is extremely poor in bigger flats and they are not giving complete area to customer. Also their charges are so high that you can purchase very spacious house in same locality.

Anonymous said...

Hi Guys,
I recently visited Gaur green vista project and found that for 13th floor ther are charging at 3200 per sq. ft and additionals charges have increased like anythin e.g EDC 190 Rs. per sq. ft. and parking cost is also increased. I am not sure if builder is not going to charge those increased cost from existing buyers.
I think we should unite and be ready to handle these situations.
Please respond back

Anonymous said...

Ya..I agree. We should unite and don't let builder play with our money.

Also wondering that how builder could increase the charges what they have agreed before.

Please all respond...

Anonymous said...

I agree.

Lets all be regular visitors to the site as well as this website, and in case the builder tries to dupe us we should collectively visit their office in CP.

Anonymous said...

Totally agree with everyone. When the project was about to start, they promised so many things like 25% covered 75% green area, big spacious rooms, and there was no mention of the phase II. Builder is doing what he wishes. Looks like he doesn't care anymore since he already has our money.

Anonymous said...

So I feel that we should meet together and find out what is the future of this project as we have spent ouour hard earned money on this.
Please fix some time and meet at the site.
What you guys say

Anonymous said...

Why not, all we should unite ASAP to resist with Builder's monopoly. What about if we could all meet day after Diwali on India gate at about 5pm.

Think we could all wear a cap/hat to identify ourself in a big crowd and then we can post our discussion on this website.

Any other idea guys..but remember that we should be doing something at earliest opportunity

Chilli Flakes said...

I agree to all of you. things is not as expected.
First I was dissappointed when V3S building was constructed in front of samrat. I asked the gaur guy and he told me that the constructed area was never shown part of gaur in brochure. I showed him brochure and he had no reply.
Next time they were cleaning area in front of maharaja and I asked worked in construction site and they told me it was something related relaince. I thought it was reliance retail but when I called up the gaqur guy he told me that it was the relaince people who collective bought some flats in NEW UPCOMING TOWER. I was furious, I asked him how can they built tower when the brochure shows it has to be commercial property and they verbally told me during sale that its height wont go beyond 4 floors. He again had nothing to say but said that flats has already been sold.

I had one thought to go to consumer court and get stay. My freind told me that builders do these things all the time. In indirapuram they have habit of builiding concrete jungles and even make best use of 100 sqft space.

Anyhow- crux is that gaur green location was best during launch but now we have to see how it would span it. I am not sure if we can stop builder bt best would be to make sure that the area which gets operational should be suitable seperated from constructed one. This project was complete sell out and I am sure all of us are dying hard to get something out of it.

I will soon start a yahoo group and post details there so that everyone gets informed through emails. Whereever people have got together they have not spared builder with big muscles like DLF.....

Anonymous said...

Yes, its high time we raise our voice and even get a stay. This is gross violation of what they sold us... Since only a few of us are on this site, I propose that we meet first and pool some resources to figure out how to reach out to other buyers..Next weekend is a long weekend so I propose we meet at Connaught Place in Barista or Coffee day and have a discussion. But if people are planning to go out, we can do this the weekend after next at the same place. Please vote for either Oct 2nd 3 pm at CP, or Oct 11th same place and time. How about it?

Anonymous said...

Yes, lets meet, I think the earliest is better. Please post the final place and time to meet with identity proof.
We should have consensus from maximum of people so that more people can be involved in this discussion.
Please decide at earliest because time is running.

Anonymous said...

I'll suggest Oct 2nd 3pm at Connaught Place Barista. I'll request everyone to confirm this or suggest an alternative, so that we can take it forward asap.

Anonymous said...

I am fine with this. Rest, please respond to move this further.

Anonymous said...

I am also disappointed with what the builder has done and we should do something.
But I dont know whether going to court and getting stay is a good move as in my opinion.
Builder has our money and this would only delay possesion.
So my question is what steps we can take.

Anonymous said...

How about meeting at the construction site Oct 3rd 3:00 pm

Anonymous said...

We guys can meet in Shipra Mall as well that would be a good idea.We can meet in front of MacD in black T shirts
please confirm timings of 3rd Oct 3:00 PM

Anonymous said...

I went to the construction site on Friday, and spoke to one of the sales guys, who said this new tower would be a 12 floor residential tower. I saw the brouchure that they gave me and yes it says Residential & Commercial complex. I don't think there's much we can do except seek satisfaction in the fact that at least construction is in final stages (Door, floor tiles, staircase grills are in place in Maharaja tower). Still if we want to meet the best place would be Gaurson's CP office where we can make a representation. How about we plan it for coming saturday so everyone has a chance to plan accordingly?

Anonymous said...

Did anyone meet on 3rd Oct? What was decided in the meeting?

Anonymous said...

Dear All,

What is the progress on meet. Please take some steps. We all are waiting for each other I suppose

Anonymous said...

I don't think we can connect this way. We'll need each other's contact numbers. I'm Gagandeep Singh, Contact# 9650402226.

We should Identify ourselves so we at least know how many we are...We should connect over phone and plan to meet up.

Anonymous said...

Hi this is Vin Agarwal. Basically I do live in Manchester UK and unable to meet up but have full support to you people if you come up with some sort of agreement.
I can be contacted on Vinod_uk79@yahoo.co.uk

Anonymous said...

Hi
I too am a future resident of GaurGreenVista.
I visited the site today only, though the construction is in full swing and we may get the possession on time, but the new commercial complex is proving to be quite a nuisance.
How are we supposed to live in that flat when there is a construction in full swing in front in the same complex. Are we supposed to live in that mess...!!!!
Its grossly wrong that the builder has misled us in many things including the so called green spance etc.

swati said...

Hi all,

My mother booked a flat in samrat there,I would like to knw when r u all planning to shift there ? Is it a safe area , I mean hows security and other things going to be ?

Regards

Anonymous said...

Hi,

I had a word with Gagandeep. My number is 9911197477. Please upload your numbers on the site so that we could contact each other.
Construction is going good but it would be good to stay if some families together are planning to move after possesion.

Anonymous said...

Hi this is Gagan. I met a couple of owners when I went there last week. I'm getting a feel that at least 25%-40% people are planning to shift there after possession. The guard told me many people are end users and had come on Diwali to light candles there :)

I don't see anything that we can do about the new tower, but my biggest concern is that we'll not have a good environment till the construction is complete. Residents should be able to do something once an RWA is put in place...

Anonymous said...

hello

is anyone selling samrat III highway facing ?

Anonymous said...

yes, I may sell Samrat III facing highway if get descent prize. have u got an offer?

Anonymous said...

Thanks Gagan,

Dear all, I have already put my number on the site. Others who are planning to shfit, please share your contacts so that we could meet and decide.

Anonymous said...

Hello

I understand , builder is giving possession by Dec end ... It is good idea ..how many are really planning to shift ? but then , what are the arrangements for Parking , Power Back up , route etc....You just cannot shift with your family ..just like that...I am already paying rent of 13,500 in mahagun ...will wait and watch ...but how long ?

Anonymous said...

I think, it would be better to shift in immediate after possession to build up some pressure on builder to provide all the facilities like parking and power back up..then whats the point buying such a expensive flat and paying rent somewhere else..

Anonymous said...

heelo everyone

anyone knows is our price of flat appriciated ? if yes ..how much ...

Anonymous said...

Well..it depends on how much you want to sell your flat ...If you had gone for downpayment through loan ..add EMI Paid till Possession ...include Parking , Metering and Registry Costs and then ...I think you Samrat Highway Facing may be around 50L OR back facing Samrat-1 may be 45 L ...but all depends on market ?

swati said...

I think there is no point in shifting there withour security and other facilities, life comes first then money and rent.we should maintain pressure on builder to arrange for security first.

Anonymous said...

I think the problem is that we really don't know what the builder is going to provide and not provide with the possession. Would the internal roads be done? would the club they promised us be in place? would street lights be there? I think if we're serious about the money we've all spent, we should plan to get together either onsite or a the Gaursons CP office, and have a talk with someone senior.

Otherwise we'll all be in for a nasty surprise when the possession happens.

If at least 7-8 people agree, I can setup a blog where we can all figure out what all we need to know and when we can get some time out to do this.

Gagan

Anonymous said...

My name is manish.My email is mkashyap_2004@yahoo.co.in
I have visited the site and office recently ,The work is going in good pace, flat is looking good, one lift is also been placed there. and here is the summary :-
1) Builder would dispatch possesion letter by jan starting and we need to tell them when we want to shift.Builder says we need to tell any date after march. They need 3 more months to give finishing touch to the flat and in the three months we have to do registry and we have to give parking and other cost to the builder.
And in these 3 months builder would construct the roads and other things.
I hope that these things like roads , lights , club would all be in place when we move in say in april.
2) Builder would also be making one flat as sample to show what we wil get in March end (and not in Dec end)after we pay the remaining things like parking , registry etc..
3) There is one more thing which I dont know how many of you noticed and that is , the wall seperating Samrat 4 and samrat 3(balconies) and similiarly samrat 2 with samrat 1 does not go till top , at present one can jump/view from one apartment to the other . I dont know whether builder would arrange for some grills to do that, I think we need to ask such questions.I think we should meet.

Can all of you intersted give me your email address so that we can meet and decide, i think it is better way.

Anonymous said...

Hi Manish,

This is great information. Thanks. My id is v.gsingh@hotmail.com.

Regards,
Gagan

Anonymous said...

Thanks All,

My id is jrupes@gmail.com

Could someone take a step and drop mail to all whose mail IDs are available.

We can meet at Gaur site also if everyone agrees

Anonymous said...

hi

So ..we can shift by April 2010 and he gives Possession letter by Dec end ..to avoid Penality ...All builders are of same standards .....and for club , park,pool etc ..just forget it ..where is the space now ...see their broucheure they showed when they started the project ...you should be happy if you get all things after 3 years , when ph 2 would be over ...we are all caught...

Anonymous said...

All the more reason why we need to group and take a stand. I'll again request everyone to identify themselves and provide their e-mail ids asap.

Gagan

Anonymous said...

All the more reason why we need to group and take a stand. I'll again request everyone to identify themselves and provide their e-mail ids asap.

Gagan

Anonymous said...

GUYS TIME TO MEET ...WE SERVICE CLASS PEOPLE INVEST LIFETIME TO GET OFF LOAN AND HOUSE

SKM said...

Hello All

There had been lot of Descripancy between the pictorial display and what actual we will be receiving.( but mind that pictorial display do not stand the court-of-law)

For example there is minimal green area or even a swimming pool where even a Frog can swim.

The construction that is going to be there is going to make hell out of life for next 3 yrs.

Also ,GDA had constructed some water tank in the upfront green belt etc etc

So next what we are suppose to do.....The best way will be to be together,form an RWA as soon as 30 people are there.Take up all the issue with builder and the Authority .

Also for now please fix a visit time to site (I suggest 3-4pm on sat or sun)so that we get lot of people there and also together visit GAURSONS LTD


Regarding the penalty clause which some of our friends have raised: please not that this is applicable from around june not from Dec.

My contact No. is 9891127545 ( SANJEEB)sanjeeb.mishra@stericsson.com

Wishing All of us a timely delevery

Anonymous said...

I agree. They even planted a park at the start of the project in the green belt to fool us. The club they've said is in the new tower being built so we'll not have it till it is ready. The final project is grossly different from what was shown to us. We at least stand a chance to have someone senior at Gaursons notice a large group of customers and maybe do something to make our lives better, like cordon off the new site to spare residents from the dust and grime. But as Sanjeeb said, first step is for us to get together.
I'm good with Saturday 3-4 pm. I don't think we'll be able to visit the office as it will close, but it'll be a good first step for us to get together. Are others okay with Saturday 3-4 pm?

Also, I see some people complaining on the site but not coming forward to identify themselves. I'll urge them to do so as I'm sure none of us is out to sell personal information but to stop Gaursons from taking us for a ride.

Anonymous said...

Well i am too a future resident and holds a SAMRAT apartment.I dont know how we can shift and live in dust of construction and noise of scavenging and drilling..+ there will be no security as lot of people and workers will come inside the apartment block due to construction activity..

I think we will only get all facilities after 2 years when phase 2 will be complete..


The builder has not told us anything about phase 2 at the time of booking,but in reality the map was already been passed by GDA plus the builder has also not given us in written that he cannot construct any other structure , therefore our claim does not hold legally ..

The only option is that we should meet the builder and have some alternate arrangements at place until the whole structure(phase 1 and 2)
gets complete..and i am sure that after completion of both the phases it will be one of the best society and great location of indirapuram with decent appreciation....so nothing to worry about guys

Anonymous said...

There have been long time that we have been discussing all these issues on blog.. now its time to meet.. i'm ok o meet on sat at3-5pm

Anonymous said...

Hi..
My ID is vinod_uk79@yahoo.co.uk

Anonymous said...

hi

Gaursons is an reputed builder and i donot think he will spoil all his reputation by playing games ...but , yes this is true ..that ..few of the things like pool , club etc..may get delayed ..since it is clubbed with Ph-2 ...Instead of having an legal fight with them , we can request them to at least provide an closed security and parking space with water and electricity with power back up to start with ...since he would provide club and pool in due course ...naturally society expenses would be less for that period ....but I agree ...Builder like gaursons should be more transparent ..as to when ..he wants to give what and so on ...but still I have full confidence in Gaursons

Anonymous said...

Hi

I have Samrat-1 at 7th Floor . Someone from Samrat-3 is ready to swap ...I can pay the reasonable differential amount .

Regards

Anonymous said...

I am OK on Saturday 4 pm. Just fix this time and come to meet.

SANJEEB said...

I did try hard to be there on sat 3-4 PM but unfortunately I was quite late.Did someone reach there.

Any update??

Anonymous said...

Did anyone reach at 4 P.M. ...at least who stay near ..should Have done that ....but then what does builder say ? I called his office ..Lady answered you will get possesion by 31st Dec ,09 , if you wish you can move after registery...so...what is next ....

second no one here is ready to come forward and say I am so and so ..except Gagan and one more ...are we afraid of builder ??? may be...

Anonymous said...

Hello everyone ..

Gaursons is very reputed builder , so do not worry .... Do not enter into an fight with builder ...you will never gain anything...

Anonymous said...

Hi,
This is Rupesh. I went to site on that day at 4:00 pm and had a look at the flat also. I taked to one the representative also that there is no entry to balcony from other room. Fo balcony there is entry from master room only but design says it is from both rooms. I thin we shud meet and atleast talk about these things with builder. He would ddefinitely find out the solution for us. So please plan this Saturday 4 pm at site.

Anonymous said...

Hello Rupesh
As per the brochure Type M1,M2,S2,S4 have two entrance to balcony
S1,S3 have only one entrance.


Which type are you talking about??
Definately this point should be taken up with GAURS.

Anonymous said...

There is no two entrance as per design ...it has only one ....I am thinking of one more door in second bedroom ...but as per design ..it is no no

swati said...
This comment has been removed by the author.
Anonymous said...

Guys, If gaursons is reputed builder why he is doing such things then? BTW nobody can stop us taking our right who ever he is. we put up our whole money to buy flat and now some one is saying that we cant gain anything fighting gaur????/ i am sure you r his side.

chilliflakes01 said...

I visited Gaur this saturday anticipating someother people but could not find any. Anyhow thats different story.

The good news is that it seems to be on time. The bad news is that Builder has not delievered what he had shown.

The passage in front of building where they had shown park, swimming pool is no more there. It is a L shaped road and they have no space for anything else.

The was told that space in front of maharaja floors is for commercial use (as highlighted in brochure too) but now they are constructing 12 floors. The space is per per Samrat floor specs and hence they have not only covered Maharaja floors but engulfed them. Same thing has happened on other side with samrat where V3S floors has come up.

In effect- Builder has got greedy and cheated all investors.
I tried and wiated for an hour for sales person to show up but bo one turned up. Then I tried to talk with a person in office (groundfloor of maharaja) and he told me that he knows nothing.

Gaursons are not entertaining your call and seems they are busy counting money.
I am bit upset with builder. It has not lived up to its reputation. I was thinking to invest in Noida Project but not now. I might go for DLF instead.

These builders dont recognize that it is project for them but it is dream for others. Why cheat poeple, should have got poeple by showing original plan, I am sure there are people who would have bought then also.

Project has lost reputation guys. Only because of Gaursons.

Anonymous said...

This is very sad that builder like GAUR ,who charged extra price for preferential location,had not delivered the preferential location and facility.

The price,we paid up in totality is huge in compared to other projects.This is because of the Reputation of GAUR and also that this project was launched during the peak price regime.

But it was never expected that GAURSON will dupe its customer to such an extent.Never mind we have seen many big names being reduced to rubbles because of its deeds.The only best thing that GAURSONS can do now is to deliver a good quality finishing( which I doubt it will) and secondly return a reasonable amount of money.(which is again a doutful proposition) and provide all other facility with nice degree and in time.

Anonymous said...

this is absolutly cheating with us and builder playing with our money..

Don't understand that why such a reputated builder has let down his reputation by not providing facilities he has promised.

we had quite few comments earlier about meeting but nobody has come forward..its all upto us guys whether we want to see our hard working money how builde splashing out on his luxury life...

Anonymous said...

Yes, There looks like no space for Pool and Park . Since New Phase-2 is comming Right on the front on on side of Samrat ( corner one) . I am not sure , if they have any Plans to build power back up facility .

This could be act of cheating , not sure from legal angle , as he claims 25% occupied and 75% Open and then everything goes down .

Is anyone knows Lawyer in this case , he knows what exactly to be done....

Anonymous said...

Lawyer....good idea...they know how to handle them ...

Anonymous said...

Builder should reduce the price and should return our money, atleast some of it..

Anonymous said...

Guys,
There are lot many problems and some alternative solutions which can discuss in meeting only
Please plan this Saturday or SUnday evening at site with some recognistion that we are all investors.

Anonymous said...

Hi Guys

Thx for the update.
Email Id : sunil.sharma@accenture.com
Contact Number : 91-9819925721

Currently I am in Mumbai and have booked a flat in Gaur Greenvista.

Now I am planning to book my holidays and air tickets to come to Ghaziabad for the registry of my flat but I am not sure which week I can book now. Also how long it will take in Registry,

Also if anyone of you know that how we could rent our flat safely without having any risk..

I would like to suggest that we should taje step forward to make RWA.

Sunil Sharma

Anonymous said...

We should now focus on getting timely possession ...I am afraid ..having lawyer ..fighting now...would delay possession ...It had happened in some societies.

Anonymous said...

I think there is no space for swimming pool and the park....We should ask the builder that when we will get these facilities..

Anonymous said...

Hi Guys,

All we can do by writing on these posts is to vent out, but we're all wasting our time. We don't want to fight the builder but just go out as a group and get a good understanding of how exactly we'll be affected by this additional construction, and if we can do a little something about a good life while we wait for phase II to complete.

The comment about renting it out, nice joke dude. Who'll want to rent a flat and live in dust and grime when there are dozens of better buildings in the area?

I suggest that we get serious about meeting and discussing, or stop visiting this site and wasting our time with anonymous posts.

Gagan

chilliflakes01 said...

Hi All,

This post has 80 comments and less information about each one of us. I understand that disclosing personal information on web can attract spammers.

Keeping this in view I have founded a new yahoo group called
Gaur Green Vista
http://in.groups.yahoo.com/group/GaurGreenVista/

You can join this group by visitng the above link.

The entry to this group require an approval so that only genuine future residents can take advantage of it. Please specify how you are related to this project and if possible your booked house number.

Information within this group would be personal only and would help us decide what steps we can take to further our cause.

These groups are very common and have actively helped investors of unitech, dlf and other projects to get things right from the builders. I hoep this would solve our purpose too.

To start with I would post some pictures from my recent trip to Gaur soon.

chilliflakes01 said...

5 memebers has already subscribed to the group

http://in.groups.yahoo.com/group/GaurGreenVista/

I hav etaken this intiative to make conversations more private and give people confidence that their identites would not go beyond residents of gaurgreenvista.

Anonymous said...

did anyone get the letter yet? for possession

Anonymous said...

Guys ...

I am waiting for Possession so that I donot have to commute from Rohini till Noida ...Rest everything is OK with me ...let Builder give Pool , Club etc whenever he likes ...let him give flat with sevage , light and water and parking space for my car ..that's all in need ...Some Rich People in this site wants to form union and fight builder ...I am not that rich ...I want Possession fast ..and I think ,most middle class service people share my thought ..RIGHT ?

Anonymous said...

Hello everyone

Does any one wants to swap Samrat-1with Samrat-III . I can pay differential amount ,depends on Floor

Any Offers

Anonymous said...

Hi
Any update on the Flat.

When r the possession letters expected?

Anonymous said...

no updates yet
any plans of meeting

Vishal Arora said...

Visited the place last Saturday. Asked them about the Possession letter. They said posession letter will be handed over only after registry. I am surprised and shocked and have never seen such thing that possession letter is issued after registry. In my case one of the allottee is out of country for 4 months and will be back only in April. So this way i would be losing a major chunk of my tax as I can't get the registry hence can't get the possession. Any one have any views

Anonymous said...

There are two things here..Physical possesssion and technical possession. They'll be giving a technical possession in Jan, based on which we'll apply for registry. After registry we'll get the key to our flats which will be the physical possession

Anonymous said...

Would we be eligible for tax benefit on the basis of technical possession

Anonymous said...

Yes. Possession for the purposes of Tax computation means that it is not under construction anymore. However, your office may ask you to provide a physical possession to make the tax rebate. So please check with them.

Anonymous said...

thanks buddy
I was thinking that we would be eligible for tax rebate only after physical possessions

Insight Vision said...

I have samrat 1 at 3rd floor. Is someone from samrat 3 ready to swap. I can pay reasonable differential amount. My email id is insightdirector@gmail.com

Anonymous said...

Hi All,

I hope we all have got the letters by now. We can plan meeting now at site as we all would be visitng the place for settlement.
Please suggest for this weekend.

Anonymous said...

Possession Letter i Hand is fine, but is it reasonably Habitable yet with so much of construction going on..!!??

Anonymous said...

Are there any people who are planning to shift somewhere in March or April beginning.
Did anyone talk to Builder or lawyesr regarding registry and all. how long this process takes etc.

Rakhi said...

yes we r planning to shift thr in march . we have visited the site two days bACK. what we have noticed is same, the park size n pool size r so small. we have given the prime location charges for these two things. but now it seems that we have wasted our money for plc. i m Vishal n my no. is 9810075843.

Unknown said...

hi this is sonia we got the possetion letter but the lawyer name they have refered i spoke to him i did not find him ok because he is saying that registry have to done as per the market price today but when i have discussed with my lawyer he is saying registry need to be done on the price in which u have purchased pls comment on the same ??

Anonymous said...

So the Ghaziabad authority has a circle rate for each area, and the registry price would be either the basic cost of the flat, or the circle rate, whichever is higher. In our case the circle rate is higher.

This is the same concept thats followed while registering properties in Delhi as well.

In a way, this is actually a good thing coz the cost of our flat is lower than the bare basic sale price of a flat in that area...



Gagan

Unknown said...

if any body will do the registry in jan or feb do let me knw how much money need to pay for tht i have 2 bedroom flat 1090 sqm one.

Chilli Flakes said...

New Post in hilli Flakes

http://niftynseoptions.blogspot.com/2010/01/gaur-green-vista-possession-has-started.html

Anonymous said...

Is there anyone who booked in Gaur Green Vista Phase II....

Negi said...

Yes i am a resident of GreenVista Phase-II. Please inform me whats its progress right now.

Anonymous said...

Hi.. Mr. Negi,
I went last week and the work is in progress.. have u recieved 2nd demand letter from builder??? Why they are delaying do u have any idea???

Negi said...

There is some floor specifications approval was pending for Block-D. But now they told they have got it from GDA but till date they have not physically received it. and whenever they have received it then they will send second demand letter. If you want any more enqury about this approval please contact to Mr. Sanjeev Vashi representative of Gursons and his contact No. 9818653366

Anonymous said...

Thanks pal for this update.. Have u applied for home loan. If yes, from which bank..

Anonymous said...

hi..mr. negi this is shashank... can i have ur mail ID.. have u too booked in D block.. what's the latest news on gaur green vista phase -II...

Negi said...

Mr. Shashank my email id is negi_aai@yahoo.com

Hemant said...

Hi,

I have booked flat in Gaur Green Vista Phase II - Tower D. I received the first demand letter in Dec but haven't paid the amount to Gaur as they have not provided the plan approval letter. As per my discussions with Mr. Sanjeev Varshney who is marketting GM for Gaur, they would be providing extension to everyone and would be sending out extension letter once they have the plan approval from GDA.

Any one else who has booked flat in Tower - D, Lets get in touch. My email id is: hemantpoonia@gmail.com

Abhilash said...

Yes I too booked in Tower - D, 10th floor. My email id is: kingabhilash@gmail.com. Lets be in touch.

Anonymous said...

Is there Any latest updates??? regarding Gaur Green Vista Phase-II, Indirapuram project. Is the approval is still pending between builder and banker.

Hemant said...

Guys,

Latest update on GGV -II tower D is that Gaursons have got all the required approvals from GDA and have submitted the same with all the leading banks(as per the email that I have got from them).

I have got email from them today about the 30% demand letter.

Regards,
Hemant

Anonymous said...

Thanks for the info. pal.. Great

Anonymous said...

Please inform which banks are giving loan for Greenvista Phase-2 D-Block

Unknown said...

SG Estates Limited - Residential Apartments, Office Space in Vasundhara, Residential Flats in Ghaziabad
SG Estates Ltd. was incorporated in the year 1986 under the aegis of its Managing Director Mr. Subhash Gupta. It’s most important resource i.e. Human Resource comprises of highly qualified, young, dynamic, creative professionals with extraordinary business acumen and insatiable thirst to work with passion.
Keywords-> Residential Projects, Residential Projects in raj Nagar, Residential Projects in Raj Nagar Extension, commercial Projects in Vasundhara, commercial Projects in Ghaziabad
SG ESTATES LTD
105-106, Deepshikha Tower, Rajendera Place, New Delhi-110008
Telephone: 011-42323230 (Hunting Lines)
Fax: 011-42323244
Email: -info@sgestates.in
Call@ 9999008503
www.sgestates.in

Unknown said...

SG Estates Limited - Residential Apartments, Office Space in Vasundhara, Residential Flats in Ghaziabad

SG Estates Ltd. was incorporated in the year 1986 under the aegis of its Managing Director Mr. Subhash Gupta. It’s most important resource i.e. Human Resource comprises of highly qualified, young, dynamic, creative professionals with extraordinary business acumen and insatiable thirst to work with passion.

Keywords- Residential Projects, Residential Projects in raj Nagar, Residential Projects in Raj Nagar Extension, commercial Projects in Vasundhara, commercial Projects in Ghaziabad

SG ESTATES LTD
105-106, Deepshikha Tower, Rajendera Place, New Delhi-110008
Telephone: 011-42323230 (Hunting Lines)
Fax: 011-42323244
Email: -info@sgestates.in
Call@ 9999008503
www.sgestates.in

Unknown said...

Projects in Raj Nagar Extension

Indigo Tower SG Impressions 58 phases -2 Raj Nagar Extension Ghaziabad, offers budget homes with facilities that fulfill the aspirations and demands of today's home seekers.
The project Ivory Tower coming up at Raj Nagar Extension, Ghaziabad on NH-58.The said project is in the same location as of Impressions compelled the group to launch another project In the form of tower, under phase 2 in the same locality of Raj Nagar Extension, Ghaziabad.
Keywords-> Flat in Ghaziabad, Project in Ghaziabad, Raj Nagar Ghaziabad, SG Impressions 58, and SG Impressions Raj Nagar Extension

Contact Us
SG ESTATES LTD
105-106, Deepshikha Tower, Rajendera Place, New Delhi-110008
Telephone: 011-42323230 (Hunting Lines)
Fax: 011-42323244
Email: -info@sgestates.in
Call@ 9999008503
http://sgimpressions58.com
http://sgimpressions58.com/lp/indigo.html
http://sgimpressions58.com/lp/ivory.html

Vinay Kumar said...

Flats in Ghaziabad

We at Good Will Homes are a young and dynamic real estate agency, which was established in 2005. Our commitment is to enhance our client's portfolio by providing competent, efficient and lucrative solutions to all their real estate requirements. We do that by offering services in investment consulting, construction, development, leasing, sale/purchase brokerage and other agency services. We are now a registered agent for Red apple homes, Red apple residency (Manju j home) etc.
Note:- Flats in Ghaziabad, Flats in Raj Nagar Extension, Flats in Delhi NCR

http://www.goodwillhomes.in/
Contact: Vinay Kumar
Raj Nagar Extension Ghaziabad
NH 58
Mobile:- +91-9818410411
+91-9654565636

http://rpc.technorati.com/rpc/ping http://rpc.icerocket.com:10080/

  © Blogger template 'Perfection' by Ourblogtemplates.com 2008

Back to TOP